Rheometal


THE RAPID S PROCESS

The Rapid S machine handles the melt by a ladle
system that works with the slurry maker.
Melt from the furnace is poured into a gravity
die to form a cylindrical piece of aluminium
serving as the enthalpy exchange material - EEM.

After cooling and trimming, the EEM is ready
for use in the slurry process.All necessary
steps for producing the EEM are done in parallel,
ensuring that a new EEM is always ready for
slurry making.

The slurry machine works in 6 parallel steps to
serve the high pressure die casting machine with
slurry when the next casting cycle is about to start.
Transparent